Excavator near me shop part FINAL DRIVE GFT50T3B84 REXROTH GFT PLANETARY without HYDRAULIC MOTOR with ce certificate top quality low price

Product Description

BN Excavator GFT9T2B47 CZPT GFT PLANETARY with CZPT MOTOR A10VE45

 

 

PART NAME

REXROTH GFT PLANETARY without CZPT MOTOR 

EQUIPMENT

apply to CZPT  GFT50T3B84 EXCAVATOR

MOTOR NO.

A6VE80.107 
A2FE80.90

CATEGORY

Construction Machinery Parts, Excavator Spare Parts

INSTALLATION

POWER TRAIN

APPLICATION

Replacement

ITEM CONDITION

NEW

LOGO

BN

MOQ

1 pc

 

DESCRIPTION:    

1. CZPT ly, assembly, and ready to installed in your CZPT  GFT50T3B84 excavators. 

2. Without MOTOR, already been installed the  MOTOR HOUSING & MOTOR SHAFT 

3. All components are produced by us.

4. All new, undamaged.

5. Painted or Unpainted, depend on requirement

6. 90 days warranty, call or email with any questions.

7. Plywood Case Packing, free of fumigation

8. Deliver to CZPT by Sea, Air, or CZPT .

 

  1. We are the manufacturer and own 18000 m2 factory areas, good relationship with material suppliers, which make more competitive price and steady quality.
  2. We have more than 80 units advanced facilities for production.
  3. We have 8 senior engineers with more than 30 years experience on designing and machining.
  4. Our sales term offer the efficient service for every CZPT ers.
  5. We are the long term parts supplier for many CZPT companies, such as FOSTER WHEELER CZPT CZPT CO.,LTD and C.R.Dinly etc.
  6. We develop spare parts for old and new CZPT  models, and submit CZPT latest products to CZPT ers every month so that to meet the market demand.
  7. We have high market share in Oversea market and Domestic market, CZPT Asia 60%, Russia 10%, Middle CZPT 8%, North and South CZPT ica 10%,Europe 8%, others 4%.

 

TRADE TERMS

EXW, FOB, CFR, CIF

PAYMENT TERMS

T/T, CZPT ern CZPT , Alipay, Paypal

PORT

HangZhou Port, negotiation

LEAD TIME

  1. Stock in hand: 4-7 days for processing and packing
  2. Bulk Production: 10-35 days, depend on the quantity.

DELIVERY

By Sea, Air, CZPT

ORDER FLOW

  1. Customers offer the part number, part name, model, quantity, data of items, delivery term.
  2. We quote the best price according to the requirement of CZPT ers.
  3. Confirm the purchase order and pay the deposit.
  4. We prepare and pack the goods.
  5. Customers make the payment according to the Proforma Invoice once the goods get ready for delivery.
  6. We delivery the goods with the packing list, commercial invoice, B/L and other documents requested.
  7. Track the transport and arrival about the goods. 
  8. Welcome to give us suggestion and feedback once arrival.

1. Warranty Type: We will replace the product which have quality problem.
2. Warranty Period:
Supply 3 months warranty for the products from the date of arrival. CZPT er should check the items according to the order list after arrival. Contact with us and offer the data, photos of the problem items.
3. You need to pay for the replacement charge for following condition:
* Wrong Order from CZPT er.
* Natural Disasters cause the damage.
* Error installation.
* The machine and reducer work over time and over load.
* Lost by any condition.
* Xihu (West CZPT ) Dis.n element destroyed.
* Corrode with rust during stock and running.
* Warranty Expired.
4. CZPT s
They are the product easy to be rust away, please wrap them well. We just supply warranty for the products we are producing, except the CZPT , Seal, and some others we mention before order.If there is any problem about the products, installation or maintenance, please contact with us any time. We reserve the rights of final interpretation.